top of page

Medway Wastewater Treatment Plant

Completed in 2015, Woolace Electric was contracted to complete all electrical components of this multi-million dollar expansion.  The expansion consisted of adding various types of pumps and equipment to the head end of the plant to allow additional flow to be treated. The plans also called for a new Bioreactor tank and new clarifier.  Additionally, Woolace installed a brand new state of the art ultraviolet disinfection equipment as a final treatment to the flow before leaving the plant.

Gallery

bottom of page