Perrysburg Wastewater Treatment

The city of Perrysburg, OH completed a 3 phase Waste Water Treatment Plant upgrade. Woolace Electric was responsible for all electrical control wiring and systems integration for this project. Included in the upgrade was a new water treatment primary settling tank, thickening tank, pump station, and septic receiving station. During the upgrade, the city of Perrysburg also converted to ultraviolet disinfection and plant SCADA system. The total expansion increased daily average capacity from 5.4 million gallons per day to 8.0 million gallons per day, including capacity increase to three aeration grit tanks, two final clarifiers, a secondary sludge control building, two blowers, two effluent pumps, and a effluent pump meter.